Renovation of the control equipment of 2 generators

1024 461 Flipo Richir

Our teams have renovated the control equipment of two 1450 KVA generators coupled to each other and to the network

We reviewed the management of load distribution and load shedding when low power usage is required.

Customer: Retail/North